Terms and Conditions
Last updated 10 Nov 2026
Mission Critical Research (“MCR”, “we”, “us”) is published by Mission Critical Engineers Ltd., Toronto, Ontario, Canada. By using this site you agree to these terms. If you do not agree, please do not use the site.
1. For reference only
This site reports what public and third-party sources say, and links those sources on every page. It is general information for reference. It is not a substitute for reading the sources themselves.
2. Only as accurate as the sources
We cite our sources so that you can check them. If a source is wrong, incomplete or later changed, an item here may be wrong, incomplete or out of date. We report what a source states; we do not guarantee that any item is accurate, complete, current or free of error.
3. No responsibility for accuracy or use
To the fullest extent permitted by law, we are not responsible for errors, omissions or delays in the content, or for anything you do or do not do because of it. You are responsible for checking the original sources before you rely on anything here.
4. No advice and no professional relationship
Nothing on this site is engineering, legal, financial, investment, tax, insurance or other professional advice, or a recommendation about any company, security, product, project or site. Using the site, reading it, signing up for emails or contacting us does not create a client, consulting, advisory, fiduciary or other professional relationship between you and us. For decisions about a specific facility, transaction or investment, consult qualified professionals.
5. Companies, people and claims
What companies, organisations and individuals say is reported as their statement and is not endorsed or verified by us unless the page says a primary source confirms it. Allegations in court filings remain allegations. Mentioning a company, product or person is not an endorsement or a criticism of it.
6. Other websites
Links to sources and other sites are provided for reference. We do not control them and are not responsible for their content, availability or accuracy.
7. Limitation of liability
To the maximum extent permitted by law, MCR, Mission Critical Engineers Ltd. and their owners, directors, officers, employees and contributors are not liable for any loss or damage of any kind, whether direct, indirect, incidental, special, consequential or punitive, arising from your use of, or inability to use, this site, or from reliance on its content. You use the site at your own risk. Nothing in these terms excludes or limits liability that cannot be excluded or limited by law.
8. Using the site
Please do not copy the site in bulk, present our content as advice, or use it for anything unlawful. You may quote short extracts with a link back to the page.
9. Copyright and others' marks
© 2026 Mission Critical Engineers Ltd. All rights reserved. The articles, headlines, summaries, selection and arrangement of content, and the design of this site are our copyright, or that of our licensors. You may not copy, republish, scrape or redistribute them without our written permission, except that you may quote short extracts with a clear credit to Mission Critical Research and a link back to the page. Company names, product names and trademarks belong to their owners and are used only to identify them.
10. No endorsement and no sponsorship
We do not endorse any company, organisation, product, service or person. Nothing on this site is sponsored, and no company named here has paid for or approved its mention. A mention is not a recommendation.
11. Corrections
If you believe something is wrong, tell us at info@missioncriticalengineers.com. We will check it against the sources, correct it and mark the correction, as set out on our Corrections page.
12. Changes
We may change these terms. The version on this page applies when you use the site, and continuing to use the site means you accept it.
13. Governing law
These terms are governed by the laws of Ontario and the federal laws of Canada that apply there, and the courts of Ontario have jurisdiction, unless the law of your place of residence gives you rights that cannot be waived.
Contact
Mission Critical Engineers Ltd., 120 Adelaide Street West, Suite 2500, Toronto, ON M5H 1T1, info@missioncriticalengineers.com.